Highway Steel Bridge Protection
Trans-Java Toll Road · 2024
Heavy-duty recoating of a major steel highway bridge exposed to a coastal, high-corrosion environment.
- Client
- National Toll Road Operator
- Location
- Trans-Java Toll Road
- Year
- 2024
- Scope
- Blast cleaning, zinc primer, epoxy mid-coat and polyurethane topcoat on 28,000 m² of steel.
The Challenge
Coastal ISO 12944 C5-High corrosivity combined with restricted lane closures made both durability and schedule non-negotiable.
Our Solution
The EPICON BRIDGE SYSTEM was specified end-to-end with QA/QC at every DFT check.
The Result
20+ year design life certified and completed without exceeding the agreed traffic-impact window.
Coatings Used in This Project
Bridge & Steel Coating

INDUSTRIAL CIVIL CONSTRUCTION
EPICON BRIDGE SYSTEM
3-coat heavy-duty system, C5 corrosion protection, long durability.